● High efficient and safe lifting, 20 to 25mins to lift one 2.8m/3.2m height shell plate to proper position
● PLC control, rigid structure, synchronously lifting
● Continuous lifting or sectional lifting can be set and chosen, Continuous lifting capability improves tank construction efficiency
● Match with NAEC tank welding machines, can realize automatic welding of inside girth/vertical seam
● Modular design ensures all jacks invested can work for different diameter tanks
● Floating roof can be made at the same when the tank body is erected. It can save time
● Reasonable oil leakage control, Less manpower needed
● High efficient and safe lifting, 20 to 25mins to lift one 2.8m/3.2m height shell plate to proper position
● PLC control, rigid structure, synchronously lifting
● Continuous lifting or sectional lifting can be set and chosen, Continuous lifting capability improves tank construction efficiency
● Match with NAEC tank welding machines, can realize automatic welding of inside girth/vertical seam
● Modular design ensures all jacks invested can work for different diameter tanks
● Floating roof can be made at the same when the tank body is erected. It can save time
● Reasonable oil leakage control, Less manpower needed